3rd Mainland Bridge To be Closed Totally from Friday
- Bayo Adetu
- October 8, 2020
- NEWS
- 0 Comments
As part of the on-going repair works on the Third Mainland Bridge, the Federal Government, on Wednesday, said the Adeniji Adele and Adekunle section of the bridge would be totally shut for two days commencing from Friday, October 9, 2020.
It would be recall that FG, in collaboration with Lagos State Government shut and commenced phase repair works on the 11.8km bridge, precisely on July 24, 2020 to last for six months.
The Federal Controller of Works, Lagos, Joshua Popoola, who announced this in a statement, said the section of the bridge would be closed from midnight of Friday, October 9 to midnight of Sunday, October 11 to allow the contractor complete the first stage of casting works.
According to Popoola, “the contractor currently carrying out repair works on the bridge is nearing completion of works on the closed section of Third Mainland Bridge and requires the total closure of both bounds of the bridge between Adeniji Adele and Adekunle to complete work.
“The total closure of this section of the bridge is to ensure that there is no vibration on the bridge during the casting in-place of the newly installed expansion joints. This is to allow for setting of the special concrete, which allows the concrete to achieve its required compressive strength.”